An Update on Sand Mining in the Hamptons: NYS DEC Procedurally Halts the DEC Processing of Sandland’s Mining Permit

May 29, 2018

In April of 2016 we published the blog entitled “Mining in the Hamptons: Appellate Division Affirms Town of Southampton Zoning Board of Appeals Limitations on Pre-existing Nonconforming Uses Associated with Hamptons Mining Operation.” Despite the Appellate Division’s decision regarding certain pre-existing nonconforming uses occurring on the site, Sand Land Corporation’s (“Sandland”) pre-existing mining use of the property was never at issue, until now.

In January 2018, the New York State Department of Environmental Conservation (“DEC”) issued a determination entitled “Ruling of the Chief Administrative Law Judge on Threshold Procedural Issue, January 26, 2018” essentially halting the DEC’s review of Sandland’s mining permit application until further information was submitted by the Town of Southampton. Sandland, was authorized pursuant to a Mined Land Reclamation Law (MLRL) permit issued by the DEC to mine sand and gravel from 31.5 acres of the 50 acre site to a depth of 160 feet above mean sea level, which is 60 feet below the surface elevation at 220 feet. In January of 2014, Sandland submitted an application to the DEC to expand its current permit to mine 4.9 additional acres and excavate the floor of the mine to 120 feet above mean sea level- lowering the mine floor by 40 feet. The DEC notified the applicant that a permit modification to expand the mine “beyond its previously approved life of mine boundaries” was considered a “new application”, classified as a “major project” and required a statement that mining was not prohibited at the site.

NYS Environmental Conservation Law (“ECL”) §23-2703, Declaration of Public Policy, Subsection 3 states, “No agency of this state shall consider an application for a permit to mine as complete or process such application for a permit to mine pursuant to this title, within counties with a population of one million or more which draws its primary source of drinking water for a majority of county residents from a designated sole source aquifer, if local zoning laws or ordinances prohibit mining uses within the area proposed to be mined.” Suffolk County satisfies this criteria having a population of one million or more and drawing its primary source of drinking water from a sole source aquifer. Opponents of Sandlands’ application argued that because mining is prohibited in the zoning district where the property is located, ECL §23-2703 (3) applies and the DEC is prohibited from processing the application.

ECL §23-2711(3) requires that the DEC notify the Town’s “Chief Administrative Officer” for properties not previously permitted pursuant to that title and seek input regarding whether mining is permitted on site.[1] The Town responded with a letter noting the Certificate of Occupancy authorizing mining on site but noted that if the DEC was characterizing this as a new mine, that new mines are prohibited in all zoning districts.[2] The Town further noted the location of the property in the Aquifer Protection Overlay District and requested that the reclamation of the property be expedited to allow the property to be used for conforming residential purposes. However, the Town did acknowledge that “certain nonconforming uses, if they are established to pre-exist zoning, are allowed to continue and even expand under certain circumstances pursuant to Town Code §330-167B”.

Additionally, the Town Code provides for the continuance of nonconforming uses pursuant to §330-115 which states, “Any lawful use occupying any building, structure, lot or land at the time of the effective date of this chapter or any amendment thereto which does not comply after the effective date of this chapter or any amendment thereto with the use regulations of the district in which it is situated may be continued in the building or structure or upon the lot or land so occupied, except as provided in § 330-119.”[3]

The DEC held a hearing where the applicant argued that the application only sought renewal of an existing permit for a lawful preexisting nonconforming use. Ultimately, however the DEC Administrative Law Judge held that ECL § 23-2703(3) prohibits the DEC from processing mining permits for mines located in towns such as the Town of Southampton, Suffolk County, where the county, with a population of over one million people, draws its primary drinking water for a majority of its residents from a designated sole source aquifer, and the town has a local law prohibiting mining in the town. Additionally, the Administrative Law Judge found that Sandland had not established that the proposed mine expansion was authorized under the Town’s local zoning laws. The reviewing Judge adjourned the matter pending submission of proof adequate to establish that applicant’s proposed mine expansion is authorized under the Town’s local law.

As determined by the New York State Court of Appeals, a prior nonconforming use for mining is unique in that it is not limited solely to the land that was actually excavated before the enactment of a restrictive zoning law (in this case, March 27, 1983) but extends well beyond.[4] The well-known Court of Appeals case, Syracuse Aggregate, established that pre-existing mining rights extend to the boundaries of the property regardless of whether that specific area was mined prior to the change in the zoning law. In examining the nature of mining as a nonconforming use the Court stated:

“By its very nature, quarrying involves a unique use of land. As opposed to other nonconforming uses in which the land is merely incidental to the activities conducted upon it, quarrying contemplates the excavation and sale of the corpus of the land itself as a resource. Depending on customer needs, the land will be gradually excavated in order to supply the various grades of sand and gravel demanded. Thus as a matter of practicality as well as economic necessity, a quarry operator will not excavate his entire parcel of land at once, but will leave areas in reserve, virtually untouched until they are actually needed.” [5]

In furtherance of this premise, the Court of Appeals in Buffalo Crushed Stone extended that holding to properties purchased in contemplation of mining that are separate and apart from the original mined parcel.[6] The Court stated,

“Consequently, a prior nonconforming use for quarrying cannot be limited solely to the land that was actually excavated before the zoning law, because-in this unique type of industry- landowners commonly leave portions of their land as mineral reserves to be excavated at a future time.[7]   Mine owners commonly leave portions of their land as mineral reserves to be excavated at a future time.”[8]

The question remains, then, how this administrative court essentially halted the continuation of this “unique” mining operation that pre-exists zoning via the DEC permitting process without applying or even considering this well-established line of Court of Appeals cases.  Indeed, the reviewing Administrative Law Judge did cite the Syracuse Aggregate case but only for the following premise: “A town’s authority includes not only the power to prohibit the development of new mines ( see id. at 684), but to impose reasonable restrictions limiting the expansion of and eventually extinguishing prior nonconforming mining uses within the town (See Matter of Sand Land Corp. , 137 AD3d at 1291-1292; Matter of Syracuse Aggregate Corp. v Weise , 51 NY2d 278, 287 [1980] Matter of 550 Halstead Corp. v Zoning Bd. of Appeals of Town/Vil. of Harrison , 1 NY3d 561, 562 [2003] [Because nonconforming uses are viewed as detrimental to zoning schemes, public policy favors their reasonable restriction and eventual elimination.]).”

However, the Judge failed to take notice of the Court of Appeals holding in Gernatt Asphalt Products, Inc. v. Town of Sardinia, 87 N.Y.2d 668, 642 N.Y.S.2d 164, 664 N.E.2d 1226 (1996), upholding a zoning law banning mining except for preexisting operations. “Towns may not directly regulate mining, but they retain the power to zone — even to zone out mining totally, as long as non-conforming uses are protected, as the Constitution mandates, to prevent a de facto taking.” See McKinney’s Practice Commentaries to NYS Environmental Conservation Law 23-2703 , Philip Weinberg (emphasis added).

Procedurally, Sandland’s mine permit expires in November of 2018. The matter was appealed administratively in a motion to reargue, a second hearing took place and we look forward to the Administrative Law Judge’s ruling.

 

[1] ECL §23-2711(3) further states,(a) The chief administrative officer may make a determination, and notify the department and applicant, in regard to: (i) appropriate setbacks from property boundaries or public thoroughfare rights-of-way, (ii) manmade or natural barriers designed to restrict access if needed, and, if affirmative, the type, length, height and location thereof, (iii) the control of dust, (iv) hours of operation, and (v) whether mining is prohibited at that location. Any determination made by a local government hereunder shall be accompanied by supporting documentation justifying the particular determinations on an individual basis.

[2] Mining effectively became prohibited in the Town of Southampton on March 27, 1981. See Huntington Ready Mix-Concrete Inc. v. Town of Southampton et al., 104 A.D.2d 499 (1984).

[3] Town Code § 330-119, Compulsory termination of nonconforming uses, bars, taverns and nightclubs, addresses the amortization of pre-existing nonconforming nightclubs.

[4] Syracuse Aggregate Corp. v. Weise, 51 N.Y.2d 278, 434 N.Y.S.2d 150 (1980); Buffalo Crushed Stone, Inc. v. Town of Cheektowaga, 13 N.Y.3d 88, 885 N.Y.S.2d 913 (2009)(stating “quarrying contemplates a gradual unearthing of the minerals in the land, as so excavation of portions of the land may be sufficient to manifest an intention to conduct quarrying on the property as a whole.”)

[5] Id. at 285, 434 N.Y.S.2d 150 (citations omitted).

[6] Buffalo Crushed Stone, Inc., 13 N.Y.3d 88, 885 N.Y.S.2d 913 (2009)(confirming the mining company had the vested pre-existing right to mine a separate parcel, “subparcel 5” which was not mined by its predecessors and separated by a road from the larger mined area.)

[7] Id. at 401.

 

[8] Id. at 396 stating, (“we hold that the long and exclusive quarrying operation of BCS and its predecessors and their preparations to use areas left as aggregate mineral reserves, consistent with the nature of quarrying, established a right of prior nonconforming usage on the disputed subparcels”).