516-227-0700

Appellate Division Affirms ZBA Determination Denying Natural Resources Special Permit for Walls Built Without Permits on East Hampton Oceanfront Property

April 02, 2018

In the Matter of 278, LLC v. Zoning Board of Appeals of the Town of East Hampton et al., dated March 21, 2018, the Appellate Division, Second Department upheld East Hampton Town Zoning Board of Appeal’s (“ZBA”) decision denying a natural resources special permit (“NRSP”) for two parallel 762 linear feet walls built without a permit by Ron Baron (hereinafter “Petitioner”) on his oceanfront property located at 278 Further Lane, East Hampton New York. Petitioner owns two additional, improved properties adjacent to 278 Further Lane, which is vacant. In September 2008, Petitioner built two parallel walls approximately four feet apart consisting of 762 linear feet along the southerly border of its property and continuing along a portion of the easterly border of 278 Further Lane. In response, in 2009 the Town of East Hampton issued citations alleging that the walls were constructed in violation of the Town Code because Petitioner failed to obtain an NRSP from the ZBA, a building permit and/or certificate of occupancy prior to constructing the walls. As part of a settlement agreement, Petitioner removed portions of the walls and submitted an application to the ZBA.

Petitioner made an application to the Chief Building Inspector in April 2010, questioning the limit of NRSP jurisdiction over the walls. By letter dated April 13, 2012, the Building Inspector determined that a “substantial portion of the wall was constructed in a location containing dune land/beach vegetation” and would require an NRSP prior to the issuance of a building permit. Petitioner appealed that determination to the ZBA, requested an NRSP and sought a variance for the accessory structures to remain on the property where there was no principal structure. The ZBA upheld the Building Inspector’s determination and found that an NRSP was required for the walls prior to the issuance of the Building Permit, denied Petitioner’s request for an NRSP, and held that since the NRSP was denied, the application for the variance for the accessory structure was rendered academic.

Petitioner commenced an Article 78 proceeding, seeking to annul the ZBA determination. The Supreme Court denied the petition and dismissed the proceeding, remanding the matter back to the ZBA for further proceedings to determine whether any variances were needed regarding the construction of the walls. Petitioner appealed; and the Appellate Division, Second Department held that the ZBA determination requiring an NRSP had a rational basis, was not arbitrary and capricious, and there was sufficient evidence in the record to support the determination. The Court stated, “petitioner failed to demonstrate that the retaining walls were erected in conformance with the conditions imposed (see Town Code §§255-4-40, 255-5-51).  Since the petitioner, which erected the retaining walls prior to obtaining any permits failed to request a lot inspection by the Town prior to construction and failed to sufficiently document preexisting conditions, the ZBA had to rely on expert testimony to ascertain the conditions in the area prior to construction Its decision to rely on the conclusions of its experts rather than the conflicting testimony of petitioner’s expert did not render its determination arbitrary, capricious, or lacking in a rational basis…” The Court overturned that portion of the Supreme Court decision, remitting the matter back to the ZBA.  The ZBA found the entire wall required an NRSP, confirming that the request for a variance for an accessory structure was academic.

Obtaining an NRSP in East Hampton Town is no small matter.   NRSP applications are regulated under four separate sections in the East Hampton Town Code:

  1. §255-1-11 “Purposes”- General Purposes for Zoning Code requires compliance with applicable sections A through M;
  2. §255-5-40 “General Standards”- General Standards for Special Permits requires compliance with sections A through M;
  3. §255-4-10 “Purposes of Article”- requires compliance with sections A through E, General Purposes for the Protection of Natural Resources; and
  4. §255-5-51 “Specific Standards”- requires compliance with sections A through K, Specific Standards and Safeguards for Natural Resources Special Permit.

Given the number of standards with which an applicant must comply to obtain this special permit, it is never surprising when an application for an NRSP is denied. It is even understandable that Petitioner constructed the walls (provided they were not greater than four feet) without permits, given an initial reading of Town Code §255-11-38 , Fences and Walls, which states, “the following regulations shall apply to all fences and walls in all districts unless otherwise indicated: A. Building permits. The erection, enlargement, alteration or removal of the following types of fences and walls shall require a building permit: (1) A fence or wall greater than four feet in height and located within the required front yard area of any lot; (2) A fence or wall over six feet in height, in any location; (3) Any fence or wall for which site plan approval is required.”  Considering the outcome of this case, however, Petitioner would have been better served making an application to the Town before constructing the walls.